GoldSun Residence V
Date: 08-07-2008
|
|
Floor |
No |
Northwest |
No |
Southwest |
No |
Southeast |
No |
Northeast |
|
1 st Floor
|
1
|
SOLD |
2 |
SOLD
|
3 |
SOLD
|
4
|
SOLD
|
| 2 st Floor |
5
|
SOLD
|
6
|
SOLD |
7 |
SOLD
|
8 |
SOLD
|
|
3 st Floor
|
9
|
SOLD |
10
|
SOLD
|
11
|
SOLD |
12
|
SOLD
|
|
4 st Floor
|
13
|
SOLD |
14 |
SOLD |
15
|
SOLD
|
16
|
SOLD
|
|
5 st Floor
|
17
|
SOLD |
18
|
SOLD
|
19
|
SOLD
|
20
|
SOLD
|
|
6 st Floor
|
21
|
Available |
22
|
SOLD |
23
|
SOLD
|
24
|
SOLD
|
|
7 st Floor
|
25
|
SOLD
|
26
|
SOLD
|
27
|
Available
|
28
|
Available
|
|
8 st Floor
|
29
|
Available |
30
|
Available
|
31
|
SOLD
|
32
|
SOLD
|
|
9 st Floor
|
33
|
SOLD
|
34
|
SOLD
|
35
|
SOLD
|
36
|
Available
|
|
10 st Floor
|
37
|
Available
|
38
|
SOLD
|
39
|
SOLD
|
40
|
SOLD
|
|
11 st Floor
|
41
|
SOLD
|
42
|
SOLD
|
43
|
SOLD
|
44
|
SOLD
|
***P.s: All Conveyancing fees are included in purchase price of our properties
Facilities &Technical Specifications:
*Swimming pool with a pool bar
*Communal Sauna
*Fully equipped Gymnasium
*Relaxing room
*24 hours supervision and maintenance by one caretaker
*100 meters to the beach at Mahmutlar
*Centre of Mahmutlar *All apartments have an en suite bathroom and a second bathroom *Penthouses have 3 bathrooms and includes a jacuzzi *Steel entrance door to apartments *Walls are noise and heat insulated *Plaster coving on ceilings *Fitted kitchen units with marble worktop *Diaphon system *Fire staircase *Individual electric water heating system per apartment *Caretaker's apartment *Car parking *Central TV satellite *The interior doors are American pressed doors *All windows are PVC, double glazed *The floors are covered with first class marble *The floor and walls of the bathroom are ceramics *Suspended PVC ceiling in bathrooms *Automatic generator in case of power cuts *Landscaped garden
Payment schedule:
Starting Date of Construction : *September 2005
Completion Date of Construction: * March 2008
|